| Office Renovation |
|
|
|
|
| This is a add-on room addition. When it was built they cut the joices to the roof and covered the cut out with a 1"x10". Allowing heat to escape between it and the brick wall.
|
|
|
|
|
| The ceiling had the old style 8"x 8" tiles. The ceiling will need a lot of mud to repair all those staple holes. The 2x4 flourecent lights will be replaced with canned recessed lights.
|
|
|
|
|
| The center window was too small and I replaced it with a 4'x 4' double pane.
|
|
|
|
|
| Had to replace the drywall below the AC/window as it was soft and mildewed. Added Insulation everywhere.
|
|
|
|
|
| Removed the single window in the middle covered the frame and framed in 2 new narrow double pane windows on each side.
|
|
|
|
|
| I moved the AC from the end wall to the middle of the room underneath the big window.
Now it also blows into the other room through the doorway and not on me directly.
|
|
|
|
|
| Repaint, didn't like it. Painted it again. Finished the baseboards and added crown molding |
|
|
|
|
| Painting wall graphics is tedious.
|
 |
 |
 |
 |
Added curtains and a cornice shelf. Canned recessed lights need to be installed yet.
|